Methodology

Where’s the vision

Experience suggests that a project without a vision is like a rudderless ship. A clear vision from the start is essential to the success of a project. It is like the corporate mission statement. It is not the project objectives (objectives are generally SMART – you shouldn’t be looking to measure the vision), rather an articulation of how the end goal of the project will touch the lives of it’s ultimate recipients; the customer or the user. What the project will do for them (not the business, not for IT, but the customer, consumer or user).

The first step then is to get the vision agreed on. Luke Hohmann’s innovation games such as product in a box are a good way of distilling the vision. Next step is to keep it live and visible. Don’t just have it buried away in the project Wiki, but have it stuck on the walls where the team work. And then use it as a frame of reference when those difficult questions arise around scope and priorities.

Why is this important? (Via Leisa Reichelt), Peter Merholz shows how Google started out with a vision for their calendar.

The vision…

The google calendar vision

And what it meant for the product when it went to market…

Google didn’t start with a bunch of features of functionality (“Drop dead simple to get information into the calendar” – that’s hardly a requirement any BA would be proud of), but by having this vision, a statement of what the product would mean to the end user, and referrring back to it when scope or design decisions had to be made, they ensured that the end product delivered real quantifiable value.

Can retrospectives be made leaner?

The <enter time period> ends and a retrospective is held.  The team writes on Post-It notes things that are important to them and they get stuck up on the wall.  And maybe they get grouped into similar topics or themes.  And then the team vote on them; the topic that has the most votes is the one the group talks about first…. and they talk about that topic at length.  (If you were to analyse the signal to noise ratio of the first topic discussed compared with the last topic discussed, you’d find significantly more noise when you start).  Actions to resolve the issues are finally addressed and identified.  The team then move on to the next topic and so on until all the topics that had votes against them are done.  And it’s been a marathon session and we are done.

But what about the topics that no-one voted on?  What about the post-it that sits alone?  It was important enough for someone to have written it.  No votes, no priority,  no discussion, no action.  Yet mining it might have  delivered a diamond action.

I don’t care much for voting in retrospectives.  It’s not a particularly efficient way of doing things.  For one because the actual process of voting takes up valuable time.  Then by the time the issue with the fewest votes comes up, the energy in the room is drained and the discussion is rushed.  So why not do away with the voting, and introduce strict time management to the retrospective discussion.  Allow five minutes to each topic.  Use a stop watch to enforce this.  This will allow all the issues that were of importance to someone to be aired.  When the five minutes is up, if there is still heat in the discussion, park it and return to it later in the retrospective.  Such an approach is more incremental, and dare I say it, Lean.

What if an RFP was an Open Day?

We recently completed writing a response to an RFP. It weighed in at just under 100 pages with almost 34,000 words. OK, so there was a lot of copying and pasting going on, but that is not an insignificant amount of effort. Multiply that by the number of suppliers who were invited to respond; add the time taken for the client to produce the RFP itself, then review responses and answer questions and it is clear that RFPs consumes a lot of everybody’s time. With the winner taking all, that is a lot of wasted effort. But hold! That is only the first stage! The list of suppliers is whittled down and a beauty parade follows. Yet more effort is spent by two or three vendors turning their word document into a bunch of PowerPoint slides. A favoured supplier is identified and a process of negotiation follows, based upon estimates and what little information the supplier knows. Finally the supplier is selected, inevitably their are surprises on both sides when the engagement starts.

So the RFP process is a standard (but inefficient) way of doing business. What if it was done a different way?

One of the more significant decisions you make in your life (if you have children) is where you will send them to school. It is not a decision you make lightly as it will have a major influence on how your child grows up in the world. In the UK the government provides data (league tables) but this can only tell you so much; there is more to education that the statistics tell (which are historical and do not necessarily reflect the current reality your child is going to face). You will probably ask around – seek the wisdom of the crowd. Undoubtedly the community can identify good schools and bad schools. But the best judge of a school is to go there, to look around, to meet the teachers, to see the children. Do you trust the leadership of the head? Would you be happy for this person to teach your child, would you like your child to play in this playground, (and more importantly) grow up with these children?

So why not apply this thinking when looking for a supplier to build you an application? At the end of the day, projects succeed on personalities and relationships. Will the vendor get on with the buyer? The RFP tells you little about that. What if the RFP process was like seeking a school for your child? What if you had a project open day where you welcomed suppliers in, got to meet them, and maybe even got them to compete against each other.

What if you had three intense days when the business, IT and prospective invited suppliers come together to define the project and complete against each other in teams to come up with the “best” solution.

What if you provide the suppliers with details of what you are looking to achieve and request a basic qualifier – company details, profitability etc (the stuff that goes on every RFP) and a list of clients they have built similar products for (not exceeding one page of A4 per client). And for costings you ask them to provide you with their proposed rate card.

What if you then invite all suppliers to a large venue with a space for everyone to gather, and break out areas for the individual suppliers to work in. You start with background and presentations from the business and from IT. You tell the story of what you want, the vision, a description of the current technology, constraints, assumptions, known risks, integration points, etc. You provide some initial direction as a large group, but then breakout into supplier teams, interspersing each team with your people – from IT and the business. You provide technology (access to your systems, whatever is needed) and domain expertise. What happens next is up to the suppliers. They then have two days to impress.

What if at the end of each day each supplier presents their output to the whole group. The following morning you outline what you like of the outputs and ask the teams to take that as input to work on. Then at the end of the last day each vendor puts in an anonymous sealed envelope with their estimate (resources required to build the application). Can this triangulation technique be any less accurate than the estimate given on the back of several pages specification in an RPP?

If we accept that IT projects are about people, implemented by people, then the benefit of this approach is that you get to work with the supplier and experience the relationship first hand, rather than through documents and practiced PowerPoint presentations. And for the supplier it reduces the time taken to respond and will be more enjoyable for those involved. After all, don’t people prefer to do rather than write about what they do?

The scourge of Document Driven Design

Documents, or rather words are the scourge of product design. Because words can never convey the true meaning or emotion of what is really required. All to often, software development projects are driven by the documentation – agile projects can be equally guilty of this- driven by words on paper (or card) that convey what the requirement is. Issue #1. Developers don’t read!

Except for a few exceptions, software is all about a user interacting with a system in order to accomplish a goal. Trying to describe that premise in terms of features and functionality is fundamentally flawed as it will be nested in the language of technical implementation, not in the user interaction. “Find” becomes “search”, “buy” becomes “shopping cart”, “check” becomes “validation” and so on. Issue #2. The desired outcomes become lost in a smog of technical jargon.

Solution: Picture Driven Design. Up front. Yeah! I’m all for up front design! A picture tells a thousand words. It has the power to remove ambiguities, clarify the vision, showing what the journey to realise outcomes look like. Start with a day in the life of… scribble out the flow, the user journey. Nothing complicated, boxes and arrows. Then scribble out what the user interface might look like. Done. That’s your up front design. That’s your documentation. That’s your scope. What you do next is up to you, write loads of documents that describe it and produce the software in a waterfall way if you want. I’d prefer you were more lean and adopted agile practices, but whatever you do, start with the picture. I’m convinced it will save much pain later on.

Do Business Analysts Destroy Value?

The usual approach for a Business Analyst is to start with the ‘as is’ situation and then model a ‘to be’ solution.  In understanding a problem, defining the as-is situation can take a number of weeks if not months.  Once the current technology, process and working practice are understood, the BA begins to define the solution.  Inevitably this solution is based upon what has been learned during the as-is analysis, thus the majority of their time is spent dwelling in the current reality rather than what could be.

Where is the value in that?  Where is the value in modelling a solution that is based upon that the current way of working?  What can you really learn about the business intent from the current as-is process?  A process that is based upon technical decisions, practical constraints and inherent complexity that were made at the time the software was built (in the enterprise world that was an average of 7.2 years ago), and hasn’t technology moved on since then?  By specifiying a system in terms of the curent reality the BA is missing a trick, and in the process is failing to add the value that the developement opportunity offers.  Indeed the BA is probably destroying value with over complex specifications that do not get down to the heart of the business need.

If Business analysts really want to create value, rather than dwelling in the past they should start with the “to-be” vision.  What are the desired outcomes of the application?  What should it do? (Not how should it do it).  Challenge existing assumptions, ignore perceived limitations and start with ‘blue-sky’ thinking.  What would we really like the application to do?  What are the customer / user goals and how can the application most eficiently (and delightfully) achieve these.  Think about the what, not the how.  Unlike the usual pattern of analysis, spend most of the time in the ‘to be’ world, only visiting the as-is to ask questions and confirm assumptions.

But that is only the first step of the BA creating value rather than destroying it. Why not go further and question the fundamental business model.  Rather than replace an old system with a new one, is it possible to reinvent the business itself?

Let’s take an example.  The client’s core business was data.  They supplied that data to their customers through an old and cumbersome desktop application.  They employed a service team to visit customers and install the system.  Data updates were sent via CD-ROM.  Their initial requirement was to maintain the desktop application.  The steer was to rebuild its functionality in an updated architecture (only one person in the company really understood how it worked, so updates were infrequent and key-man depecncy was a real concern to the business) develop a new local database and provide the ability to download batch data updates via the web.

The business analysis could easily capture requirements based upon this vision, yet they would be doing the client a diservice.  It would be possible to design and build a new desk-top aplication that woud be installed by the service team.  The technology would be better, database querries would be faster and customer attrtion would be slowed.  But it would be missing a trick.  The desktop application that IT wanted to rebuild was not where the value was.  The value was in the data.

Understanding what clients actually wanted and how they used the data (they used the desktop application to mine the data then copied and pasted into excel) it was possible to begin to challenge the existing assumptions.  The desktop app had charting and graphing functionality – why rebuild that when Microsoft do rather a good job of that with a product called Excel.  The requirements slowly changed into the ability for clients to pull data into excel via a web service.  It now would be possible to charge for data usage enabling creative new packages to be offered to different customers.  Previously customers had requested for changes to calculations and models to be implemented on updates for the desktop application.  Now the business started thinking about building a community where customers could create and share excel models and calculations on community website.  IT was helping the business create new value, setting aside the current reality and entering a domain of new possibilities.

The business analyst moved on from being a requirements taker to a change agent.  This was possible only with the mind-shift away from paying lip-service to the way the current application worked and thinking in terms of what and what if.

What the customer wants

I’m a strong proponent of engaging the customer in all stages of the design process. But sometimes you need to be careful with what they say and not always believe their first answer.

Ask the customer “what do you want” and the chances are you will get an answer that is rooted in their experiences and expectations. Not what they really want.

I want an intranet portal“.

No, you don’t. You want a place where your employees can share files and documents.

I want a google search appliance“.

No you don’t. You want to be able to find documents quickly and efficiently.

Worse is when vendors try and force products onto the customer…

You want an integrated BI toolset“.

No they don’t. What they really want is to be able to pull some specific data from a legacy application into an excel spreadsheet and insert a graph into a word document.

OK, so it is easy to say that, but how to follow though? How do you actually get the customer to create a vision of what they really want? Well I’d start by not asking them that question. Get them to articulate what their goals are. Then try to understand in what context they will try to accomplish those goals? Think in terms of customer journeys and value outcomes over features. Think about the what, not the how. Start with the “to-be” vision rather than dwelling in the “as-is” quagmire, indeed use a system obituary to kill the as-is thinking. Use visual tools to model your ideas. And don’t get bogged down in detail.

I’ll write more about this in the future…

Cutting waste: dump PowerPoint and invest in a camera

So you’ve run a workshop and generated ideas. There’s a list of points on the flipchart and diagrams on the whiteboard. What now? Write it all up in Word or commit the drawings to PowerPoint?

Stop! Ask yourself why you are doing this? Is it just to record the ideas, to socialise back to the group involved in the workshop? Creating PowerPoint slides is not always an inconsiderable effort. It takes time. That effort is waste.

Think of the purpose of what you are doing. Then take photographs of the flipcharts and whiteboard diagrams, paste them into PowerPoint, and think of how much time and effort you have just saved.

What not how

All too often the business thinks in terms of the “how” rather than the “what”. But why should they care how something is to be implemented? Why doesn’t the business state their requirements in terms of their desired outcomes? What is it that they want? Then, and only then should anybody think about the “how”.

Sadly, focusing upon the how rather than the what is a driving factor behind so much of the mediocrity in enterprise software. Rather than stating “what” (they want) in terms of their dreams and aspirations, the business express their requirements in terms of what they perceive IT can deliver. “What” could never be the design quality of Apple (visionary) because they believe the “how” (their IT team) is not Apple (mediocre). But wouldn’t your average developer rather be building something visionary than something mediocre?

Paired introductions

Starting a meeting or workshop with new people will almost certainly commence with introductions.  Usually I will ask participants to say not only who they are and what department they are from, but also why they think they are at the meeting.  If someone is not sure, or says “because my boss told me to attend” there might be an issue.

Last week I attended a workshop run by a couple of our developers from China.  Because paired programming is a fundamental practice to what we do, they asked the participants to do paired introductions.  Participants paired, were offered a minute to talk to each other and then introduce their colleague.  Because the team already knew each other, they didn’t need the minute to prepare.  As each participant introduced his colleague, he emphasised the persons strengths and good points.  At the end of the introductions there was a tremendously positive vibe in the room which set the meeting up for success.  It might have taken a little longer than just doing the straight introductions, but the value was clear; get people to introduce their colleagues – it breaks the ice, promotes the positive (and as a facilitator gives you another hook by which to remember people).

Was it just a simple database query?

So the sensitive personal details of 25m people has been lost and there is a huge political furore over it. Whose fault is it? As far as I can see, (and this is my personal opinion,) blame must lie with IT, specifically the IT contractor and either the contract they work with or the perception of that contract.

The National Audit Office asked HM Customs and Excise for child benefit in “desensitized form”. Sensitive details were specifically asked to be removed, ostensibly to make the file size smaller. This would require a bespoke query to be run. It was deemed too costly so it was assumed that a full extract of the data would do. The fact that this was then burned to a CD, posted unregistered mail and lost is not the point (that is stupidity). What is the point is the IT contract prohibits the business (in this case the governmental offices) to do their job properly.

What sort of contract demands extra payment for a simple database query for “NI numbers, child benefit numbers and children’s names in order to select a risk-based sample of cases to audit as part of anti-fraud work“?

Surely this is an extra request that an experienced database analyst could easily run in the course of a day? If not you must ask why not – is it because the database is badly designed with nested tables and stored procedures and stuff that would make a decent DBA go eugchhh (I’ve seen that happen). If this is the case, the IT contractor has done a bad job; if an electrician worked in your house and left a mess of an electrical installation, would you keep employing them, even if they were cheap?

Maybe however it would not have incurred a cost and this was just the perception; “we must not… run additional scans/filters that may incur a cost to the department”. If this was case it suggests a breakdown in the relationship between the business and IT, with tendency towards the confrontational and transactional rather than co-operation and partnership.

Organisations that outsource their IT often fail to realise what the true costs are. Anything outside the terms of the contract is a change request. It is not unusual for the request itself to incur a cost (someone has to write the documentation, specifiy the design, estimate the effort) before a line of code is written. (At one organisation I worked with that had outsourced their IT function, I was told that to add some basic client-side field validation to a single field on an application form on their website was likely to cost in the region of £60k). The business starts to believe that everything costs and IT becomes a hindrance and a vicious cycle commences.

How could things have worked differently? Let’s say the HMRC IT department was run on more lean/ agile lines. With agile it embraces change. The request comes in (let’s assume such requests are not regular occurances) and in the morning stand-up the BA describes the request and asks the developers for its feasibility in a word. Someone says “yes, I ran a simiar querry last month, it’ll take me ten minutes”. (In reality double or treble that estimate), but it will not have an imact on the developers ability to get thier prioritised work completed. Alternatively the developers say “given the database structure we have inherited that’s a lot of effort” or the project manager says “another request?! pritoritise it like the others!” and it is prioritised in the weekly iteration planning meeting (pushing something else out) and then it gets done.

My hope is that when the inevitable investigation takes place, they don’t just look at the policies and procedures, but also at the underlying structure of the way that IT is managed.

5 of 11
123456789